GE CORPORATE OFFICE

GE corporate office at Maneja had an aggressive time frame of 4 months to complete the 450 person’s capacity office interior and renovation. We had to follow the rigorous NBC and also safety norms as per the GE global guidelines. The design contract was including Architecture – with changes to the elevations and internal changes, Interior design with installations and graphic design, Mechanical, Electrical, Plumbing and Firefighting works. This was a comprehensive design brief which was completed as per specified timeline given by the clients.


Interior

Vadodara

30,000 SFT

Completed 2020