ECL BALCO

Industrial building design is always driven by purpose more than anything else. This project required us to create an industrial structure to accommodate both SODEG -the France based company and ECL – the Italy based company along with the Balco rodding shop, furnace shop and office block. We provided design inputs, architectural solutions, structure and MEP support to develop a  standalone industrial building. The design fulfilled specific needs of all technically functional spaces included in the rodding process and other requirements of the clients.


83,000 Square Feet


Completed 2011